Free NHIE sample questions

Real questions from the National Home Inspector Examination practice bank, with the correct answer and an explanation for each one. No junk, no filler.

Try them in the simulator Same questions, with study, timed and flashcard modes.

Showing 6 of 12 free sample questions.

Question 1Choose one

During an exterior site inspection, an inspector observes a perimeter safety fence surrounding an inground swimming pool. While the section over concrete patio maintains a 3.5-inch vertical clearance to grade, a 20-foot section runs over a loose gravel bed with a 3.5-inch vertical clearance. How should the inspector evaluate this condition?

Question 2Choose one

True or False: According to established residential pool barrier safety standards, an outdoor pedestrian access gate leading into a swimming pool enclosure is permitted to swing inward toward the pool, provided it is equipped with a self-closing and self-latching device.

Question 3Choose one

While inspecting an exterior wood deck attached to a single-family residence, an inspector notes that the 2x8 preservative-treated ledger board is secured with 1/2-inch lag screws directly through exterior stone veneer into the house rim joist. How should the inspector report this condition?

Question 4Choose 2

An inspector is evaluating guardrail and stair rail openings on an elevated exterior deck that stands 42 inches above the lawn. Which TWO of the following opening limitations comply with standard building safety provisions? (Select TWO) flowchart TD Walking["Deck Surface Guard (>30 in)"] --> G4["Max 4 in Sphere Opening"] StairRail["Stair Guard Infill"] --> G438["Max 4-3/8 in Sphere Opening"] StairTriangle["Bottom Rail & Tread/Riser"] --> G6["Max 6 in Sphere Opening"]

Question 5Choose one

An inspector is evaluating a second-story exterior wood deck that extends 12 feet out from the main building framing. The deck ledger is constructed of 2x10 preservative-treated lumber fastened to a 1-inch engineered rim board. Upon checking underneath the deck assembly, the inspector observes that the ledger is attached to the house using 3-inch spiral framing nails driven straight into the rim board, with no lag screws or through-bolts present. Additionally, there are no lateral hold-down tension hardware devices connecting the deck joists to the interior floor framing. Which of the following describes the primary structural hazard and correct reporting action for this deck assembly?

Question 6Choose one

In a residential crawlspace, an inspector examines 2x10 solid-sawn floor joists (nominal depth 9.25 inches) spanning 14 feet. A subcontractor has cut a rectangular notch measuring 2 inches deep by 4 inches long into the bottom edge of a joist in the outer one-third of the span. According to standard wood framing provisions, how should this notch be evaluated? graph LR A[End 1: D/4 notch max] --- B[Outer 1/3 Span: D/6 notch max] --- C[Center 1/3 Span: No Edge Notches] --- D[Outer 1/3 Span: D/6 notch max] --- E[End 2: D/4 notch max]