Free 312-76 sample questions

Real questions from the Disaster Recovery Professional (EDRP) practice bank, with the correct answer and an explanation for each one. No junk, no filler.

Try them in the simulator Same questions, with study, timed and flashcard modes.

Showing 10 of 20 free sample questions.

Question 1Choose one

During a tabletop exercise for a business continuity plan, the facilitator presents a scenario where the primary data center has been rendered inaccessible due to a regional power outage. The DR team lead immediately instructs the technical staff to initiate the failover to the secondary site. Which critical step in the BCP activation process was missed?

Question 2Choose one

A DR consultant is reviewing a company's data recovery strategy. The company uses virtualization extensively and has implemented VM replication to a secondary site with a 15-minute Recovery Point Objective (RPO). The consultant notes that while the virtual machines are replicated, the virtual network configurations, including VLANs, firewall rules, and IP addressing schemes, are managed manually and are not documented in the DR plan. What is the primary risk associated with this finding?

Question 3Choose one

True or False: In a Business Continuity Management System (BCMS) compliant with ISO 22301, the Business Impact Analysis (BIA) and risk assessment are independent activities that can be performed in any order.

Question 4Choose one

A financial institution is required by regulators to demonstrate the ability to recover its trading platform at a secondary site and process transactions for a full business day. Which type of disaster recovery test would BEST satisfy this requirement?

Question 5Choose one

A company is implementing a new backup solution. The backup administrator has configured a schedule that performs a full backup on Sunday and differential backups Monday through Saturday. If a complete server failure occurs on Thursday afternoon, what is the minimum set of backup media required to perform a full restoration? gantt title Backup Schedule dateFormat ddd axisFormat %a section Weekly Backups Full Backup :done, sun, 1d Differential :done, mon, 1d Differential :done, tue, 1d Differential :done, wed, 1d Crash Event :crit, active, thu, 0d Differential :fri, 1d Differential :sat, 1d

Question 6Choose one

A DR planner is evaluating storage technologies for a primary data center. The key requirements are high performance, high availability, and block-level storage access for a large database cluster. Which technology should be recommended?

Question 7Choose one

The measure of the maximum tolerable period in which data might be lost from an IT service due to a major incident is known as the ______.

Question 8Choose one

**Case Study:** Global Logistics Inc. (GLI) operates a central ERP system hosted on a VMware vSphere cluster in their primary data center in Chicago. The BIA identified the ERP system as Tier 1, with an RTO of 2 hours and an RPO of 15 minutes. The company has a secondary data center in Denver, which is currently used for development and testing workloads. The current DR strategy relies on nightly backups to a NAS, which are then replicated to the Denver site. This process results in an RPO of 24 hours. The IT team is small, and the budget for new DR initiatives is limited. Management has mandated a solution that leverages the existing Denver facility and minimizes operational overhead. The CIO has asked for a proposal to meet the stringent RTO/RPO requirements for the ERP system. The solution must be reliable and allow for non-disruptive testing. The existing network link between Chicago and Denver has sufficient bandwidth for continuous data replication. Which proposed solution BEST meets all of GLI's requirements and constraints?

Question 9Choose one

A risk assessment has identified a high-impact, low-probability risk of a long-term regional power grid failure. The organization's primary data center has a UPS and a diesel generator with 72 hours of fuel. The business continuity plan calls for a response that ensures operations can continue for up to two weeks. Which risk treatment strategy is being employed by having the generator?

Question 10Choose 3

When developing a Disaster Recovery Plan, what are the primary outputs of the Business Impact Analysis (BIA) that serve as critical inputs for strategy selection? (Select THREE)