Free HQT-4180 sample questions

Real questions from the Hitachi Vantara Qualified Professional - Vsp Midrange Family Installation practice bank, with the correct answer and an explanation for each one. No junk, no filler.

Try them in the simulator Same questions, with study, timed and flashcard modes.

Showing 10 of 20 free sample questions.

Question 1Choose one

An installer has just replaced a faulty cache module in a VSP E590. After the physical replacement, the system alerts still show the component as failed. What is the most likely reason for this discrepancy, and what is the immediate next step?

Question 2Choose one

A customer is expanding their VSP E790 by adding a new drive box populated with SAS SSDs. The existing system uses RAID-6 (6D+2P) for all its pools. The customer wants the new drives to be part of a new, separate pool optimized for a high-transaction database application. Which RAID configuration should the installer recommend for the new pool to maximize write performance?

Question 3Choose 2

Which two statements accurately describe the function and characteristics of the Service Processor (SVP) in the VSP Midrange family? (Select TWO)

Question 4Choose 2

An installer is at a customer site to perform a firmware upgrade on a production VSP E990. The customer wants to ensure the procedure has minimal risk. What are the first two critical steps the installer must perform before starting the firmware update process? (Select TWO)

Question 5Choose one

True or False: When adding a new drive enclosure to an operational VSP E-series system, the installer must power down the entire storage system to ensure the new enclosure is detected correctly.

Question 6Choose one

During a 'New Installation' procedure, the installer must use the System Option Mode (SOM) to set the initial system serial number.

Question 7Choose one

A logistics company is installing a VSP One Block system in a remote warehouse with limited IT staff. A key requirement is proactive monitoring and automated support case creation with Hitachi Vantara. The installer has configured the system's management network settings and can access Storage Navigator. What is the next essential step to fulfill the monitoring requirement?

Question 8Choose one

An installer is creating host groups on a VSP E590 to provide storage to a cluster of VMware ESXi servers connected via Fibre Channel. To ensure proper failover and load balancing, what is the best practice for configuring the host group and host mode options?

Question 9Choose one

A technician is troubleshooting a back-end connectivity issue on a VSP E790 with multiple drive boxes. They observe a solid amber fault LED on a specific SAS port on a back-end module (DKB). According to standard troubleshooting procedures, what is the most logical first step?

Question 10Choose one

What is the primary purpose of the 'New Installation' procedure as defined in the VSP Midrange Family installation documentation?

10 more free samples are waiting

Create a free account to unlock the whole HQT-4180 sample bank, or get full access to all 207 practice questions in the simulator.

Create account