Free GPM-b sample questions
Real questions from the Certified Green Project Manager - Basic practice bank, with the correct answer and an explanation for each one. No junk, no filler.
Try them in the simulator Same questions, with study, timed and flashcard modes.
Showing 10 of 20 free sample questions.
A global logistics company is selecting a project methodology for a new fleet electrification initiative. The project has high regulatory scrutiny, fixed deadlines for carbon reduction, and complex dependencies between charging infrastructure installation and vehicle delivery. Which delivery method would be MOST appropriate to manage the complex dependencies while ensuring strict adherence to the sustainability compliance deadlines?
True or False: In the context of the P5 Standard, the 'Product' dimension refers exclusively to the physical goods produced by a project and does not include the services or results generated.
A project manager is creating a Critical Path Method (CPM) schedule for a sustainable building project. The project includes a 'Green Concrete Curing' activity that requires 28 days of waiting time before the next phase can begin. This waiting period consumes no labor resources but is essential for the concrete to reach its structural integrity and carbon-sequestering properties. How should this be represented in the schedule network diagram?
Which of the following International Standards provides guidance on **Social Responsibility** and is a key reference for the 'People' dimension of the P5 Standard?
In an Agile project focused on developing a new software application for energy trading, the Product Owner wants to ensure sustainability is considered in every iteration. Which of the following is the MOST effective way to integrate sustainability into the Agile process?
A project team is conducting a P5 Impact Analysis for a new chemical processing plant. They are evaluating the 'Planet' dimension. Which of the following elements should be considered under the 'Biological Diversity' sub-category? (Select TWO)
The 'Prosperity' dimension of the P5 Standard includes the sub-category of 'Business Agility'. Which of the following best describes how a project contributes to Business Agility in a sustainable context?
You are managing a project to develop a new biodegradable packaging material. During the 'Process' review (P5), you identify that the team is traveling extensively for face-to-face meetings, generating a significant carbon footprint. Which action best addresses this 'Process' impact while maintaining team effectiveness?
Review the following Case Study: **Case Study: Eco-Resort Development** **Background:** A hospitality company is building a luxury eco-resort on a tropical island. The project aims to be carbon neutral and support the local economy. **Situation:** During the excavation phase, the project team discovers an unknown underground water source that the local village relies on during droughts. The original design for the resort's foundation would contaminate this source. The project is already 2 weeks behind schedule. **Constraint:** The investors require the resort to open by the start of the tourist season (6 months away) to ensure financial viability (Prosperity). The local government demands protection of the water source (People/Planet). **Question:** Using the PRiSM methodology, what is the most appropriate course of action for the Project Manager?
10 more free samples are waiting
Create a free account to unlock the whole GPM-b sample bank, or get full access to all 247 practice questions in the simulator.