Free ICGB sample questions

Real questions from the Iassc Certified Lean Six Sigma Green Belt practice bank, with the correct answer and an explanation for each one. No junk, no filler.

Try them in the simulator Same questions, with study, timed and flashcard modes.

Showing 10 of 20 free sample questions.

Question 1Choose one

A project team is conducting a Failure Modes and Effects Analysis (FMEA) on a new online order entry system. They have identified a potential failure mode: 'Incorrect shipping address captured.' The team has assigned the following scores: - Severity: 8 (major disruption; customer receives order late) - Occurrence: 3 (occurs infrequently) - Detection: 7 (only detected by customer complaint after shipment) What is the Risk Priority Number (RPN) for this failure mode, and what does it primarily indicate?

Question 2Choose 2

A hospital is aiming to reduce the turnaround time for lab results. The project team has collected data and determined that the process is stable but has a Cpk of 0.75. Which of the following activities should be the team's immediate priority in the DMAIC process? (Select TWO)

Question 3Choose one

True or False: In a Lean environment, 'pull' systems are designed to minimize overproduction by producing goods or services only when there is a downstream demand.

Question 4Choose one

A software development team wants to analyze the relationship between the number of 'lines of code' (X) and the 'number of defects' (Y) in a software module. After creating a scatter plot, they perform a simple linear regression analysis. The analysis yields an R-squared (R-sq) value of 85%. What is the correct interpretation of this R-sq value?

Question 5Choose one

**Case Study:** A large e-commerce company, 'GlobalCart', is experiencing a high rate of customer complaints related to delayed shipments. A Six Sigma Green Belt is assigned to lead a project to address this issue. The project charter defines the primary metric as 'Order-to-Delivery Time' and the goal is to reduce the average time by 25% and the standard deviation by 40% within six months. The project team is currently in the Measure phase and has created a high-level SIPOC diagram. During data collection, the team discovers that there are multiple data systems tracking different parts of the process: one for order placement, another for warehouse picking, and a third for courier tracking. The timestamps in these systems are not synchronized, and some data is manually entered, leading to potential inaccuracies. Before analyzing the end-to-end process time, the team is concerned about the quality of the data they are collecting. What is the most critical next step the Green Belt should take to ensure the integrity of the project's Measure phase?

Question 6Choose one

A project team is trying to identify the 'vital few' causes of defects from a long list of potential causes generated during a brainstorming session. Which tool is most effective for this purpose?

Question 7Choose one

Which of the following describes the Cost of Poor Quality (COPQ) category that includes the costs of scrap, rework, and material waste identified *before* a product reaches the customer?

Question 8Choose one

A team is designing a Poka-Yoke (mistake-proofing) device for an assembly process. The goal is to prevent a part from being installed backward. The team designs a fixture with an asymmetric pin configuration that only allows the part to be inserted in the correct orientation. What type of Poka-Yoke method is this?

Question 9Choose one

A Green Belt is analyzing customer survey data where customers rate their satisfaction on a 1-5 scale (ordinal data). To compare the satisfaction ratings between two customer segments (A and B), which statistical test is most appropriate?

Question 10Choose 2

A project charter has been created, and the problem statement is defined as: 'Customer satisfaction is too low.' Why is this problem statement considered weak from a Six Sigma perspective? (Select TWO)

10 more free samples are waiting

Create a free account to unlock the whole ICGB sample bank, or get full access to all 255 practice questions in the simulator.

Create account