Free ICGB sample questions
Real questions from the Iassc Certified Lean Six Sigma Green Belt practice bank, with the correct answer and an explanation for each one. No junk, no filler.
Try them in the simulator Same questions, with study, timed and flashcard modes.
Showing 10 of 20 free sample questions.
A hospital is aiming to reduce the turnaround time for lab results. The project team has collected data and determined that the process is stable but has a Cpk of 0.75. Which of the following activities should be the team's immediate priority in the DMAIC process? (Select TWO)
True or False: In a Lean environment, 'pull' systems are designed to minimize overproduction by producing goods or services only when there is a downstream demand.
A software development team wants to analyze the relationship between the number of 'lines of code' (X) and the 'number of defects' (Y) in a software module. After creating a scatter plot, they perform a simple linear regression analysis. The analysis yields an R-squared (R-sq) value of 85%. What is the correct interpretation of this R-sq value?
**Case Study:** A large e-commerce company, 'GlobalCart', is experiencing a high rate of customer complaints related to delayed shipments. A Six Sigma Green Belt is assigned to lead a project to address this issue. The project charter defines the primary metric as 'Order-to-Delivery Time' and the goal is to reduce the average time by 25% and the standard deviation by 40% within six months. The project team is currently in the Measure phase and has created a high-level SIPOC diagram. During data collection, the team discovers that there are multiple data systems tracking different parts of the process: one for order placement, another for warehouse picking, and a third for courier tracking. The timestamps in these systems are not synchronized, and some data is manually entered, leading to potential inaccuracies. Before analyzing the end-to-end process time, the team is concerned about the quality of the data they are collecting. What is the most critical next step the Green Belt should take to ensure the integrity of the project's Measure phase?
A project team is trying to identify the 'vital few' causes of defects from a long list of potential causes generated during a brainstorming session. Which tool is most effective for this purpose?
Which of the following describes the Cost of Poor Quality (COPQ) category that includes the costs of scrap, rework, and material waste identified *before* a product reaches the customer?
A team is designing a Poka-Yoke (mistake-proofing) device for an assembly process. The goal is to prevent a part from being installed backward. The team designs a fixture with an asymmetric pin configuration that only allows the part to be inserted in the correct orientation. What type of Poka-Yoke method is this?
A Green Belt is analyzing customer survey data where customers rate their satisfaction on a 1-5 scale (ordinal data). To compare the satisfaction ratings between two customer segments (A and B), which statistical test is most appropriate?
A project charter has been created, and the problem statement is defined as: 'Customer satisfaction is too low.' Why is this problem statement considered weak from a Six Sigma perspective? (Select TWO)