Free LSSGB sample questions
Real questions from the Lean Six Sigma Green Belt practice bank, with the correct answer and an explanation for each one. No junk, no filler.
Try them in the simulator Same questions, with study, timed and flashcard modes.
Showing 10 of 20 free sample questions.
A project team is developing a new software application and wants to proactively identify potential failures and their impact on the user. They need to prioritize these potential failures to focus their mitigation efforts. Which of the following tools is specifically designed for this purpose? (Select TWO)
In Design of Experiments (DOE), an interaction effect occurs when the effect of one factor on the response variable depends on the level of another factor.
A project charter has been created to address a high rate of customer complaints about product delivery times. The problem statement is: "Customers are unhappy with our delivery times." Why is this an ineffective problem statement?
A hospital's patient admission process has a target completion time of 15 minutes. A recent process capability study for 100 admissions yielded a Cpk of 0.45. What can be concluded about the process?
A project team is trying to determine if there is a statistically significant difference in the average call handling time between two call centers, A and B. The data from both centers is normally distributed, and the variances are assumed to be unequal. Which hypothesis test is the most appropriate to use?
A manufacturing plant wants to reduce energy consumption. A Green Belt plans a Design of Experiments (DOE) to optimize the settings of three factors on a large machine: Speed (High/Low), Temperature (High/Low), and Pressure (High/Low). Due to production constraints, only 4 experimental runs can be conducted instead of the full 8. This type of experiment is known as a ___________.
Which of the following elements are essential components of a comprehensive Control Plan? (Select THREE)
**Case Study** A large e-commerce fulfillment center, "SwiftShip Logistics," is facing significant challenges with its order picking process. The center uses a manual system where pickers receive a list of items on a handheld device and travel through aisles to collect them in a tote. Customer complaints about incorrect items have increased by 30% in the last quarter, and the average time to pick a multi-item order has risen by 15%, missing the internal target of 10 minutes. The operations manager has sponsored a Six Sigma project, and a Green Belt has been assigned to lead it. The project charter defines the goal as "Reduce picking errors by 50% and decrease average pick time to below 10 minutes within six months." The team has completed a SIPOC diagram and collected initial data showing that errors are not tied to specific pickers or times of day but seem to be related to item location complexity and similar-looking products. In the Measure phase, the team needs to validate its measurement system for picking accuracy before establishing a reliable baseline. The current system involves a QC inspector checking a sample of totes at the packing station and marking them as 'Correct' or 'Incorrect'. To assess the reliability of this inspection process, the Green Belt plans to conduct a study. Which type of study is most appropriate for validating the consistency of the 'Correct'/'Incorrect' inspection assessment?
Which of the following describes the primary purpose of the 'Sort' (Seiri) step in the 5S methodology?